For BIS Certification details Visit
  
Home
Company Profile
Prince  
Pride  
Prime  
Prince Global uPVC White Pipes & fittings  
Prince Global Agri Pipes, Fittings and Ball Valve System  
Prince Global PPR Plumbing Systems  
Prince Global Tube Well Systems  
Swept Fittings  
Rainwater Systems  
Prince CPVC  
Prime Sanitaryware  
Showcase
e-Catalogue
Downloads
News
Events
SMS Services
Order Form
Sales Inquiry
Contest Us
A Tribute To Our Chairman
Awards
Press Clips
Sitemap
 
 
 
Print Order Form
PRINCE GLOBAL PPR PLUMBING SYSTEMS
 
Jointing Method of PRINCE PPR Systems
 

Cuttings

  1. Cut the pipe right angle to its axis using burr free cutter.
  2. Ensure that pipes is free from burrs or cutting chip
  3. Clean the pipe & fitting perfectly before welding.
  4. Mark welding depth at the end ofpipes.

Heating

  1. Mount the suitable dies on heating element of welding machine according to the diameter of Pipe and fitting to be welded.
  2. Connect the welding machine to 220/230 volts A.C. power supply.
  3. Select 260 Deg. C. temperature on the welding machine thermostat.
  4. Wait for reaching the required working temperature.
  5. Insert the pipe and the fitting in the dies by exerting light pressure.
  6. For heating time, refer the table given for different sizes of Pipes.

Welding

  1. After heating, quicklyinsert pipe into the fitting by exerting light pressure.
  2. Any misalignment should be corrected immediately after insertion to avoid any Stress in the weld.
  3. Allow the joint to cool as per cooling time given in table.

This type of connection ensures perfect sealing even under the severe working
Conditions. ber can start to make next joint.

Recommended Time For PPR Fusion Joints.

PIPE DIA.
(MM)

WELDING DEPTH
(MM)

HEATING TIME (SEC)

WELDING TIME
(SEC)

COOLING TIME
(MIN)

20

14.50

6

4

2

25

16.00

7

4

2

32

18.00

8

6

4

40

20.50

12

6

4

50

23.50

18

6

4

63

27.50

24

8

6

75

30.00

30

8

6

90

33.00

40

8

6

110

37.00

50

10

8

160

55.00

60

15

10

Points to be Noted.

This is being seen that second time heating of pipes and fittings not properly works hence pipes and fittings for joining at a times.

  1. Heating and welding operation should  not be broken up
  2. Welding time and insertion depths must be observed.
  3. A double, uniform ring of melted material around entire perimeter of the joint confirms good quality of the weld.
  4. Welding time and insertion depths must be practical.
  5. Pressure test must be carried out before concealing the pipe work.
  6. Bending of pipes should be avoided.
  7. It is recommended neither to store nor to install the product in places which are directly exposed to ultraviolet rays.
  8. Pipes should be stored in a pile with the maximum height of 1.2 m

Concealed Work

While doing concealed bathroom work, it is advised to make the required network on floor by proper measurement of different pipe lengths.  To avoid misalignment, guiding marks on pipes and fittings should be referred.

« Top »   
Prince  |  Pride  |  Prime  |  Prince Global uPVC White Pipes & fittings
Agri Pipes, Fittings and Ball Valve System  |  PPR Plumbing Systems  |  Tube Well Systems 
Swept Fittings  |  Rainwater Systems  |  Prince CPVC  |  Prime Sanitaryware
  
Company Profile | Product Range | Showcase | e-Catalogue | Downloads | News | Events
SMS Services | Order Form | Sales Inquiry | Careers | Contact Us | A Tribute
Awards | Press Clips | Sitemap
All rights reserved © 2004 Prince SWR System Pvt. Ltd. :: Best View in 800 x 600 IE 4.0 & Above.